The Leader extended a welcome to the four graduates and law
student who were attending the meeting of Cabinet as observers. Councillor D.I. Smith provided a progress update on the
Investigators Report on the floods at Glasdir, Ruthin which had been presented to County Council on the 10th
September, 2013. He explained that the
agreed recommendations were being progressed and that Assembly Member, Alun Davies, Minister for Natural Resources and Food had
visited the site on the September, 2013 to meet the residents. Funding issues had been discussed and Taylor
Wimpey had agreed to provide a third of the required funding, Finance Officers
had confirmed a further third would be made available from Denbighshire and
discussions regarding the remaining third were continuing with Welsh
Government. Members were informed that
sand bags had been placed in situ prior to construction of a bund which was
currently at the design stage. |
|
APOLOGIES Decision: No apologies received. Minutes: No apologies received. |
|
DECLARATION OF INTERESTS Members to declare any personal or prejudicial interests in any business identified to be considered at this meeting. Decision: No Members declared any personal or prejudicial interests in any business identified to be considered at the meeting. Minutes: No Members declared any personal or prejudicial interests in any business identified to be considered at the meeting. |
|
URGENT MATTERS Notice of
items which, in the opinion of the Chair, should be considered at the meeting
as a matter of urgency pursuant to Section 100B(4) of the
Local Government Act 1972. Decision: No items were raised which in the opinion of the Chair, should be considered at the meeting as a matter of urgency pursuant to Section 100B(4) of the Local Government Act, 1972. Minutes: No items were raised which in the opinion of the Chair, should be considered at the meeting as a matter of urgency pursuant to Section 100B(4) of the Local Government Act, 1972. |
|
To receive the minutes of the Cabinet meeting held on the 30th July, 2013 (copy enclosed). Decision: RESOLVED: - that the Minutes of the meeting held on Tuesday, 30th
July, 2013 be approved as a correct record and signed by the Leader. Minutes: The Minutes of the Cabinet
meeting held on Tuesday, 30th July, 2013 were submitted. Matters arising:- 5. Food Review Task and Finish Group – Councillor
D.I. Smith confirmed that recommendations of the Group had now been
implemented. 9. North Denbighshire Office Accommodation Review
– Councillor B.A. Smith explained that it had been agreed that in the event of
the Ty Nant Officers not being rented out a further report would be presented
to Cabinet. Councillor H.C. Irving
confirmed that the Ty Nant building would not be vacated until confirmation of
further usage was received. 14. Corwen
Flood Risk Management Scheme – Award of Contract – Councillor H.Ll. Jones confirmed that the Scheme would commence on the
7th October, 2013. RESOLVED: - that the Minutes of the meeting held on Tuesday, 30th
July, 2013 be approved as a correct record and signed by the Leader. |
|
FINANCE REPORT UPDATE PDF 76 KB To consider a report by Councillor Julian Thompson-Hill (copy enclosed) which provides the latest financial position and progress against the agreed budget strategy. Additional documents:
Decision: Councillor J. Thompson Hill presented the report,
circulated previously, which provided an update on the Council’s current
financial position. RESOLVED - that:- (a) Cabinet receives the report and notes the
progress against the agreed budget strategy, and (b) an update report in respect of Post 16
transport provision be presented to the next Cabinet meeting. Minutes: Councillor J. Thompson Hill presented the report,
circulated previously, which provided an update on the Council’s current
financial position. The report summarised the Council’s revenue budget and
savings for 2013/14, Appendix 1, the net budget being £192m. There had been a forecast under spend on service and corporate budgets of £501k at
the end of August which represented a variance of
0.55%. School budgets forecast a
positive movement on balances of £190k, £352k last month. Appendix 2 detailed the progress to date against the savings
highlighted in the Medium Term Financial Plan for 2013/13. A savings target of £3.061m had been agreed
for the year and currently 54%, £1.666m, had been
achieved. It was explained that narrative supporting service forecasts
would be necessary as summarised in the report:- Communications, Marketing & Leisure - the
current forecast had been to break-even but there were several volatile budgets
dependent on meeting large income targets. Based on present figures all budgets
were on target. Customer & Education Support – There had been a projected under spend of £110k, £58k
related to delays in the full implementation of the Customer Services
restructure. Business Transformation/ICT - the forecast had been the budget would be slightly under
target by £1k. Any year end under spend
from the service could be utilised to fund gaps in the next phase of the
Council’s ICT strategy, particular reference being made to the Microsoft
Enterprise Agreement. Highways & Environment Services – a forecast over spend of £194k with the majority relating
to School Transport Service. This had
been influenced by the number of school days in the 2013/14 financial year
partly due to the timing of the Easter break.
Pressure had been lessened following a review of reserves resulting in
the release of £106k. This pressure had
been reduced following a review of reserves resulting in the release of £106k,
mainly the Yellow Bus Reserve of £101k which was now no longer required. Adult & Business Services – the 2013/14 outturn was currently forecast to be a £45k under
spent. The national requirement to
protect social care budgets had resulted in additional funding within the year
of £905k. Children & Family Services – an under spend of £539k had been reported with £285k
relating to staffing budgets, a £94k under spend on specialist placements, £61k
identified for a fostering placement which was no longer required and £99k of
the under spend rolled forward from 12/13 which had not yet been
committed. Savings had been proposed for
2014/15 around some of these budgets and discussions were taking place with
Leisure Services to consider future service delivery models to provide active
programmes for Children with Disabilities (CWD). The service proposal had been that £250k of
any under spend be set aside in a CWD Reserve for future use. Schools - the
projection for school balances had been £3.060m at the end of August, a
positive movement of £190k on balances brought forward from 2012/13 of £2.870m.
The outturn included protection of £775k provided as transitional financial
assistance for schools affected by funding formula changes. With regard to Corporate budgets there had been a forecast
to generate an under spend of £350k.
There were uncertainties around centrally held allocations for energy,
pensions and other costs but the availability of £350k had been assumed,
however, if financial contingencies were required the assumption would be
reviewed. Corporate Plan reserves of £10.3m had been carried forward into 2013/14, leaving a cash requirement of approximately £11.7m required to deliver the Plan. The 2013/14 budget specifically earmarked new budget resources of £600k to be allocated to the Corporate Plan Reserve and ... view the full minutes text for item 5. |
|
ANNUAL: PERFORMANCE REVIEW 2012/13 PDF 45 KB To consider a report by Councillor Barbara Smith (copy enclosed) about the Council’s draft Annual Performance Review for 2012/13. Additional documents: Decision: Councillor Barbara Smith presented the
report, circulated previously, which provided Cabinet with the opportunity to
scrutinise the Council’s draft Annual Performance Review for 2012/13, Appendix
I, prior to a final draft being presented to Council in October, 2013. RESOLVED - that Cabinet agrees that the draft 2012/13 Annual Performance Review be
submitted to County Council for approval. Minutes: Councillor Barbara Smith presented the
report, circulated previously, which provided Cabinet with the opportunity to
scrutinise the Council’s draft Annual Performance Review for 2012/13, Appendix
I, prior to a final draft being presented to Council in October, 2013. The Corporate Plan 2012-17
outlined the Council’s strategic direction and priorities for the five-year
period. The Authority’s intentions to
assist in the delivery of the priorities had been set out in Annual Service
Plans and the Corporate Plan Annual Deliver Document. The Council also had a number of equality
objectives within its Strategic Equality Plan, and a set of Outcome Agreements
with the Welsh Government. The Annual Performance Review provided a retrospective evaluation
of the Authority’s success in delivering against its commitments during
2012-13, and of whether it had successfully fulfilled its obligation to make
arrangements to secure continuous improvement.
Problems had been encountered in obtaining information due to the more
sophisticated performance management system based on excellence thresholds
rather than locally-set targets. In reply to questions from Members the HBPP explained that
information which had been unavailable, related mainly to the Residents Survey
and had been noted as “tbc”, would be incorporated in
the report prior to its presentation to Full Council. He confirmed that the Council were obliged to
publish the Annual Performance Review for their Regulators who would expect the
Authority to provide a comprehensive and substantial amount of information in
relation to its performance. Members
were reminded that this was the first year of the Plan and next year’s figures
could be utilised for comparison purposes.
It was explained that the colours provided in the report could be used
for analysis purposes while the figures produced depicted trends. The HBPP highlighted the need to recognise
the Council’s position in terms of ambitions, targets and to reflect the
absolute quality in relation to other Authorities and organisations. Councillor H.Ll.
Jones emphasised the importance of the inclusion of the development of rural
areas and made reference to the indicators relating to Rural Denbighshire. An Equality Impact Assessment (EqIA),
Appendix 2, had been undertaken on the Corporate Plan and had been presented to
Council when approved in October, 2012. The performance information in the document had been
provided by services and drawn from the Ffynnon
performance management system.
Consultation had taken place with the Senior Leadership Team (SLT) and
the Performance Scrutiny Committee. The
risk of any significantly negative reports from external regulators had been
identified in the Corporate Risk Register.
Failure to publish the Annual Review by the 31st October
deadline would be likely to result in statutory recommendations from the Wales
Audit Office, with significant implications for the reputation of the Council. The Chief Executive explained that the Authority had
raised its expectations and moved away from traditional targets and therefore
an increase in red indicators could be expected. He confirmed that red indicators were not
necessarily an indication that the Authority were under achieving but that the
Council had set more challenging targets than previously and had become more
aspirational. The importance of
measuring excellence in comparison with the wider private sector public
standard was emphasised if higher standards were to be achieved by the
Authority. The Chief Executive
acknowledge there were areas which required addressing, particular reference
was made to the undertaking of Equality Assessments and provision of raised
kerbs, and failure to address such issues was unacceptable. The HLDS responded to concerns raised by a number of Members and explained that timescales did not permit for the inclusion of an update from Scrutiny in the report being presented to Cabinet. ... view the full minutes text for item 6. |
|
SUPPORTED HOUSING PROTOCOL PDF 80 KB To consider a report by Councillor Bobby Feeley (copy enclosed) on a process to enable the Council to take fair and balanced decisions about the location of “supported housing”. Additional documents: Decision: Councillor Bobby Feeley
presented the report, circulated previously, which set out a process to enable
the Council to take fair and balanced decisions about the location of
“supported housing” (SH). RESOLVED - that Cabinet agrees:- (a) the adoption of the protocol attached as
Appendix 1. (b) the operation of the protocol and Panel be
monitored and reviewed after a period of twelve months with the outcome of the
review reported to Cabinet, and (c) an audit of the number and location of
supported housing schemes which currently exist in Denbighshire be conducted. Minutes: Councillor Bobby Feeley presented the report, circulated previously, which set out a process to enable the Council to take fair and balanced decisions about the location of “supported housing”. Councillors R.L. Feeley and H.C.
Irving respectively introduced and provided a detailed summary of the
report. It was explained that a decision
had been required on the adoption of the protocol, Appendix 1. Members were informed that SH could provide
schemes for a wide range of groups which included:- ·
Frail
older people ·
People
with medical conditions ·
Young
people not yet ready for independent living ·
People
fleeing domestic violence ·
Those
leaving institutions, including ex-offenders, and ·
Those
with alcohol and drug related issues Details of bodies entitled to submit proposals for SH had
been outlined in the report and included external bodies such as the Bail
Accommodation and Support Service, Probation or BCUHB. Confirmation was provided that in all cases
supported housing would be for local people.
Members concurred with the views expressed by Councillor Feeley that the operation of the protocol and Panel be
monitored and reviewed after a period of twelve months with the outcome of the
review reported to Cabinet. Finding suitable locations for SH could be highly
contentious in local communities for a range of reasons. It could cause conflict, lead to distrust of
the Council and to behaviours which were discriminatory, including against
groups protected by the Equalities Act 2010.
The need for suitable accommodation for local vulnerable individuals was
emphasised together with the consequences of not meeting the needs. The CDMW confirmed that there was currently no formal system
for the Council to consider all perspectives and take a reasoned decision about
a proposed location. The protocol,
Appendix 1 had been developed by officers in conjunction with the two relevant
Lead Members, representatives of the political groups and the Homelessness
Champion. A similar protocol developed
in Wigan had been utilised but had been based on the experience of Denbighshire
officers and Members over a number of years and through both straightforward
and highly contentious proposals. The protocol set out a carefully considered approach to
making decisions about the proposed location of supported housing. Key features included:- ·
defining what
information would be shared with whom and at what stage. ·
a structured approach
to collating information about a particular site proposed and its strengths and
weaknesses. ·
a structured approach
identifying any planning issues at an early stage. ·
clear approach
identifying the potential “sensitivity” of a potential scheme in the interests
of ensuring fair and considered treatment for all involved. ·
recommended approaches
for sharing information about schemes with those most affected. ·
the establishment of a
“Supported Housing Panel”, reporting to Cabinet, which would make
recommendations on a proposed location having considered all information and
perspectives. Details of costs, the consultation process undertaken and
the risks and measures implemented to address them had been included in the
report. A copy of the Equality Impact
Assessment had been included as an Appendix to the report. Members concurred
with the views expressed by Councillor Feeley that
the operation of the protocol and Panel be monitored and reviewed after a
period of twelve months with the outcome of the review reported to Cabinet. Councillor J. Butterfield explained that the Rhyl Member Area Group (RMAG) had considered and opposed the scheme, expressing the view that the Rhyl residents and Elected Members had limited involvement in the formation of the scheme and its eventual implementation. She explained that the West End of Rhyl already had an excessive number of housing schemes which included a large number of houses of multiple occupancy. Councillor Butterfield acknowledged the ... view the full minutes text for item 7. |
|
PROPOSED CORPORATE SAFEGUARDING POLICY AND PANEL PDF 56 KB To consider a report by Councillor Bobby Feeley (copy enclosed) which proposes the adoption of a Corporate Safeguarding Policy and the establishment of a joint Member/Officer Corporate Safeguarding Panel. Additional documents: Decision: Councillor Bobby Feeley
presented the report, circulated previously, on the proposal for the adoption of a
Corporate Safeguarding Policy and the establishment of a joint member/officer
Corporate Safeguarding Panel (CSP). RESOLVED:- that Cabinet agrees:- (a)
the adoption of the Corporate Safeguarding Policy. (b)
the establishment of a Corporate
Safeguarding Panel with terms of reference as described in Appendix 8 to the
report, and (c)
that safeguarding training be mandatory for all Elected Members within
the first twelve months of appointment to office. Minutes: Councillor Bobby Feeley
presented the report, circulated previously, on the proposal for the adoption of a
Corporate Safeguarding Policy and the establishment of a joint member/officer
Corporate Safeguarding Panel (CSP). Councillor Feeley
explained that Denbighshire’s proactive approach to ensuring compliance with
its safeguarding responsibilities had been outlined in the report. Despite a range of approaches Denbighshire
could not be confident that robust safeguarding practice had been embedded across
all the Council’s functions. Details of
the development of approaches adopted to maintain a corporate profile and
overview for safeguarding issues had been provided in detail. It was explained by the CDMW that the
key responsibility to be discharged across a complex multi-functional organisation
had never been clarified or separately resourced. Successive authoritative reports, which
included the Waterhouse, Laming, Pembrokeshire, had made it abundantly clear
that challenges to the resilience of safeguarding arrangements evolved in many
different places, and safeguarding had to be “Everybody’s Business”. Over the last ten years Denbighshire had developed several
approaches to maintaining a corporate profile and an overview for safeguarding
issues and these had been detailed in the report. A draft Corporate Safeguarding Policy
and Guidelines, based heavily on that recently adopted in Gwynedd following an Estyn Inspection and as the result of requirements set out
by the Inspectorate, had been circulated with the report. The proposal submitted would provide a
logical development to the work previously undertaken with the Corporate
Accountabilities Framework and on the Corporate Safeguarding Action Plan. The aim of the policy and guidelines would be
to establish a structured means for ensuring that safeguarding was an issue
taken on by every service in the Council as well as all elected Members. Key aspects of the policy and guidelines had been summarised in
the report and the Appendices provided further detail relating to:- -
basic information about signs of abuse and
referral pathways, which would link to child and adult protection procedures. -
a useful section on Code of Conduct and Safe
Working practices. -
a section setting out the training support to
be provided initially, which would need to be developed over a period of time. -
cross referencing with our Safe Recruitment (Human Resources) Policies. -
guidelines for Councillors on safe contact. -
dealing with allegations of professional abuse,
including links with child and adult protection procedures. The CDMW explained that the package
would provide a credible approach to making a reality of safeguarding as a
corporate concern, and would foster consistency of approach and accountability
and be tailored to the issues facing particular services. The main cost implications would be threefold
had been outlined in the report. It was
confirmed that the adoption of the Policy and Panel arrangements could have
positive implications, especially for older people and disabled people, and no
negative implications had been identified. Although guidelines were currently
sparse, HR were undertaking work to produce a policy
on social media use. The CDMW confirmed
that the remit of the further work in this area would be incorporated in the
remit of the CSP. Cabinet were informed
that the WLGA had produced a guidance document on Elected Members use of social
media which could be of assistance. The Corporate Governance Committee had considered and expressed their support of the adoption of the Policy, guidance and Panel. However, they had raised some issues about the document’s internal consistency, which had subsequently been addressed. Members had made some specific suggestions about additions to the policy/items for the work programme, particularly relating to advice and good practice guidance on the use of technology/social media. These had been accepted and it was proposed ... view the full minutes text for item 8. |
|
NORTH EAST WALES SENSORY SUPPORT SERVICES PDF 16 KB To consider a report by Councillor Eryl Williams (copy enclosed) which detailed the formation of a North East Wales Sensory Support Service in partnership with Wrexham County Borough Council and Flintshire County Council. Additional documents:
Decision: Councillor Eryl
Williams presented the report, circulated previously, which detailed the
formation of a North East Wales Sensory Support Service in partnership with
Wrexham County Borough Council and Flintshire County Council. RESOLVED:- that Cabinet:- (a)
recognises the positive actions taken to enhance the
service available to children and young people
with a sensory loss across the counties of Flintshire, Wrexham and
Denbighshire, and (b)
approves the decision to move
to a sub-regional service. Minutes: Councillor Eryl Williams presented the report, circulated previously, which detailed the formation of a North East Wales Sensory Support Service in partnership with Wrexham County Borough Council and Flintshire County Council. The report outlined the progress
made to bring into being the sub-regional sensory service and sought approval
for the decision to move to a partnership delivery model. In response to a WG directive to increase
collaboration and consortium working, the formation of a regional Sensory
Service had identified as a priority by Inclusion Officers across North Wales. Sensory impairment services were small and
highly specialised in many Authorities.
Partnership working would enable
greater resilience and efficiency through enhanced scale and enable service
users to benefit through a greater range of specialist staff being available to
support children and young people and their families and carers. Following exploratory meetings with the six
North Wales Local Authorities (LA’s), officers from Wrexham, Denbighshire and
Flintshire had proceeded to scope a service to cover North East Wales. A full
business case, Appendix 1, had been developed by the three LA’s and a
Partnership Agreement, Appendix 2, had been created along with other associated
documentation. A full
service model for delivery had been developed to fit within the combined current
budget allocated for sensory provision by the three LAs. The
Partnership Agreement outlined the financial arrangements between Flintshire,
the host Authority, Wrexham and Denbighshire which identified the detail around
provision and process. The Agreement
indicated the shared financial responsibilities of all partners in relation to
staff and assets should the Partnership be dissolved. Consultation
would take place with all service staff and their union representatives. Officers had liaised with Betsi
Cadwallader University Heath Board professionals and the voluntary sector regarding the
proposed changes in service delivery. An
Equalities Impact Assessment had been completed, Appendix 3. It had been considered that the sub-regional development would provide positive benefits for
children and young people with a sensory loss.
The service model would result in a more efficient and effective service
which could be delivered within the existing budget. The overarching risk had been
identified as the inability to deliver the range of service required by
children and young people, and future sustainability of service within the
current model. RESOLVED:- that Cabinet:- (a)
recognises the positive actions taken to enhance the
service available to children and young people
with a sensory loss across the Counties of Flintshire, Wrexham and
Denbighshire, and (b)
approves the decision to
move to a sub-regional service. |
|
PROCUREMENT TRANSFORMATION UPDATE PDF 89 KB To consider a report by Councillor Julian Thompson-Hill (copy enclosed) which provides an update on the various procurement initiatives being undertaken as part of a wider Procurement Transformation Programme. Additional documents:
Decision: Councillor Julian Thompson-Hill presented the report,
circulated previously, which provided an update on various procurement
initiatives that were being undertaken as part of a wider Procurement
Transformation Programme, and sought Cabinet approval to proceed with three
Procurement projects outlined in the report. RESOLVED:- that Cabinet approves:- (a) that
Denbighshire becomes an official member of the Welsh Purchasing Consortium for
the next 3 years up to 31st March, 2016, with an annual contribution
fee of £13,500. (b) the
development of a Business Case for the creation of a joint service by merging
the Strategic Procurement Units of Denbighshire and Flintshire County Councils,
and (c) the
development of a Business Case for the Three County Procurement Service
involving initially Denbighshire, Flintshire and Gwynedd County Councils based
upon a Category Management Structure. Minutes: Councillor Julian Thompson-Hill presented the report,
circulated previously, which provided an update on various procurement
initiatives that were being undertaken as part of a wider Procurement
Transformation Programme, and sought Cabinet approval to proceed with three
Procurement projects outlined in the report. Councillor Thompson-Hill explained that Procurement had been
perceived as the solution to a number of issues which had been identified in
the report. Competing demands had been
set against pressures such as a focus on reducing the ‘back office’ functions
of organisations and a relatively small group of staff nationally. The proposals contained in the report were
complementary and Appendix 6 identified how they would fit together. The report would provide guidance through the
upcoming changes, and as to how the Council should react to them. Current key initiatives included:- ·
The creation of a new National Procurement
Service, to be implemented by November, 2013, would address the 20% of the
common and repetitive spend across the Welsh public sector. ·
The ending of the North Wales Procurement
Partnership in June, 2013 and potential replacement by joining the Welsh
Purchasing Consortium. ·
Ensuring the Welsh Procurement Policy Statement
launched by the Assembly Minister for Finance and Leader of the House be incorporated, in order to promote SME friendly
Procurement as well as realising Community Benefits. ·
Implementation and greater use of e-procurement
solutions. ·
Incorporating the procurement actions arising
from Denbighshire’s Economic and Community Ambition Strategy. It had been anticipated that the
Council’s new Procurement Strategy would be finalised in October, 2013. In order to incorporate and reflect the new
procurement initiatives the current Contract Procedure Rules had been reviewed
and a draft set of CPR’s would be distributed for consultation within Service
Area and presented to Council for approval.
An Internal Audit Report on
Procurement of Construction Services had highlighted that a number of
improvements were required regarding the way construction procurement was
undertaken. The progression of the
projects within the report would address many of the issues highlighted within
the Internal Audit report. Following the closure of the North Wales Procurement
Partnership (NWPP) a letter of invitation had been received from the WPC
Management Board, Appendix 1, in conjunction with the WLGA, inviting North
Wales Councils to consider joining the WPC to create a Welsh Local Government
Procurement Consortium involving all 22 Welsh Councils. The NWPP had over 5 years realised cashable
efficiencies of £2.4m across the 6 North Wales Councils, highlighting the
benefits of collaborative procurement.
By joining the WPC Denbighshire would utilise a similar procurement
solution on a national rather, however, the cost implications of joining as an
individual Council would involve an annual membership subscription of £13,500
in comparison to £44,000 with the NWPP.
Denbighshire would also undertake to lead on an agreed number of
contracts. Cashable and non-cashable
benefits arising from the WPC membership had been highlighted in Appendix
2. The option of joining the WPC was
currently being considered across North Wales Councils. The WLGA were also considering bringing the
WPC within its governance framework to enable it to become an all Wales Local
Government Procurement Service. The NWPP Management Board had commissioned CAPITA to produce a Business Case on North Wales Regional Procurement. Following consideration of the Business Case it had been decided not to progress any further on the basis of six Local Authorities. In order to progress Procurement Transformation on a sub-regional basis two new individual projects emerged out of the original Capita report. The two projects, as detailed in the report, were both subject to a joint application for funding from Welsh Government Regional Collaboration Fund, Appendix 5. Early indications had been ... view the full minutes text for item 10. |
|
VOLUNTEERING, APPRENTICESHIPS, WORK EXPERIENCE, GRADUATES AND INTERNSHIPS PDF 118 KB To consider a joint report by Councillors Barbara Smith and Hugh Irving (copy enclosed) which provides a summary of the work in coordinating work streams including volunteering, graduates, apprenticeships, work experience and internships. Additional documents:
Decision: Councillor Hugh Evans presented the report, circulated previously, which provided a summary of the work undertaken in Denbighshire in coordinating a number of work streams including volunteering, graduates, apprenticeships, work experience and internships (VGAWEI). RESOLVED:- that Cabinet agrees the adoption of:- (a)
the
Corporate Volunteer Strategy, Appendix 1 to the report, and (b)
the targets for the
volunteering work programme and for the continued work to develop work experience
placements, internships, graduate traineeships and apprentices as set out in
paragraph 4.8 of the report. Minutes: Councillor Hugh Evans presented the report, circulated
previously, which provided a summary of the work undertaken in Denbighshire in
coordinating a number of work streams including volunteering, graduates,
apprenticeships, work experience and internships (VGAWEI). It focused on a potential future programme of
work to develop volunteering which would bring significant benefits to the organisation,
and further advance its “bringing the Council closer to the community” priority
and its regeneration priority. Funding to support the development of VGAWEI had originally been allocated as part of the People and Places Board programme and details of resources and funding had been summarised. Investment had exceeded targets in most cases but funding had ended in September, 2013. The report proposed a continuation of the programme with a stronger emphasis on the development of volunteering. Significant outputs had been achieved as a result of investment in graduate trainees and details had been incorporated in the report, with a fuller account included in Appendix 2. The cost of developing the opportunities had been relatively modest, £40k for 12 months’ staff costs and a £40k match fund. Most opportunities created had been supported via external funding with a high proportion of young people taking up the opportunities having been retained by the organisation, with others successfully gaining work elsewhere. Information available indicated that a high value had been place on the opportunities by young people and managers and that the work had enhanced the Council’s reputation in the community. The development of volunteering had not advanced as quickly as that for employment opportunities. It had been considered that the development of volunteering would bring significant benefits to the organisation and these had been outlined in the report. From research carried out regarding volunteering within Denbighshire, Appendix 2, it had been apparent the organisation would benefit from a more strategic focus and sustainable coordination of volunteering opportunities. A Corporate Volunteer Strategy had been developed, Appendix 1, which outlined a consistent approach to the attraction, management and retention of volunteers. In addition services had agreed to fund an interactive Volunteer Management Information System (MIS) which provided a clear portal for all volunteer opportunities within the organisation. This system would allow for an effective approach to the management of volunteers and provide new opportunities. CET had agreed to fund a post for 12 months from allocations for corporate priorities and the Spend to Save fund because of its potential to add value to all priorities. The purpose of the post had been outlined in Appendix 3 and summarised in the report. The sector leading approach to the management of volunteers would ensure a flow of talent to other traineeship opportunities. It was anticipated that as part of adopting the strategy and the implementation of the post the following outcomes would be achieved:- - Increase of 200 volunteers in the first year with the total number of people volunteering reaching 2000 by 2016. - 60 work experience placements. - 5 traineeships and 5 graduate internships. - 35-40 apprentices. Denbighshire had a clear vision on how the investment and creation of opportunities such as volunteering and traineeships would contribute to the Corporate Priorities. A substantial amount of work had been achieved but could not be absorbed by other officers. Continued investment would be required to ensure work on the volunteering strategy and traineeships was further developed to achieve its full potential benefit. An outline of how the programme would contribute to developing the local economy and provide benefits to the community in terms of had been summarised in the report, together with, its effect on other services which included costs relating to ... view the full minutes text for item 11. |
|
To consider a report by Councillor Julian Thompson-Hill (copy enclosed) which outlines the Council’s investment and borrowing activity during 2012/13, and provides details of the economic climate at that time and shows how the Council complied with its Prudential Indicators. Additional documents: Decision: Councillor Julian Thompson-Hill
presented the report, circulated previously, on the Council’s Treasury
Management (TM) activities, investment and borrowing activity during 2012/13
and it provided an overview of the economic background for the year. RESOLVED - that Cabinet:- (a) notes the Annual Treasury Management Report
for 2012/13, and (b) requests that the concerns raised regarding
Prudential Borrowing in respect of the HRA be conveyed to Welsh Government. Minutes: Councillor Julian Thompson-Hill presented the report,
circulated previously, on the Council’s Treasury Management (TM) activities,
investment and borrowing activity during 2012/13 and it provided an overview of
the economic background for the year. Councillor Thompson-Hill
explained that it was a requirement of the CIPFA Code of Practice on Treasury
Management for the Council to prepare an annual report on treasury activity for
the previous financial year. Cabinet had
been required to note the performance of the LA’s TM function, and its
compliance with treasury limits and Prudential Indicators during 2012/13 as
reported in the Annual TM Report 2012/13. The TM included the
management of the Council’s borrowing, investments and cash flow with
approximately £0.5bn passing through the Council’s bank accounts annually. The Council’s outstanding borrowing was
£133.26m, with an average annual interest rate charge of 5.77%. At any point during the year the Council
would have between £20-£35m to invest which on average currently earned 0.80%. It was confirmed that the Council had consulted with its
treasury advisers Arlingclose Ltd. The governance of TM was scrutinised by the
Corporate Governance Committee throughout the year and they had reviewed the
Annual TM Report for 2012/13 prior to its submission to Cabinet. Councillor J.M. McLellan,
Chair of the Corporate Governance Committee, confirmed that the Committee had
endorsed the performance of the Council’s Treasury Management function during
2012/13, and its compliance with the required Prudential Indicators as reported
in the Annual TM Report 2012/13. The HFA responded to a question from Councillor H.Ll. Jones and provided an explanation as to why the
Council were not permitted to undertake debt re-financing. It was emphasised that TM was a vital part of the Council’s
work. It required a sound strategy and
appropriate controls to safeguard the Council’s money to ensure reasonable
returns on investments and the effective and prudent management of debts. The HFA referred to the four main drivers of
growth and explained that consumer confidence had initiated some of the growth
in recent times. Good investment and
borrowing decisions would allow for additional resources to be directed to
other services. The impact of the HRA on
the Council’s Revenue Budget was highlighted for Members and particular
reference was made to Appendix B, compliance with prudential Indicators
2012/13:- ·
Estimated and Actual Capital Expenditure. ·
Estimated and Actual Ratio of Financing Costs to
Net Revenue Stream. ·
Capital Financing Requirement. ·
Authorised Limit and Operational Boundary for
External Debt. ·
Upper Limits for Fixed Interest Rate Exposure
and Variable Interest Rate Exposure. ·
Maturity Structure of Fixed Rate borrowing. ·
Total principal sums invested for periods longer
than 364 days. ·
Adoption of the CIPFA Treasury Management Code The report summarised
the purpose of the Annual TM Report which had been to:- ·
present details of
capital financing, borrowing, debt rescheduling and investment transactions in
2012/13. ·
report on the risk
implications of treasury decisions and transactions. ·
confirm compliance with
treasury limits and Prudential Indicators. TM was inherently risky
and the Council monitored and controlled potential risks as outlined in the
report, however it was confirmed that it would be impossible to eliminate these
risks completely. The TM strategy and
procedures were audited annually and the latest internal audit review had been
positive with no significant issues raised. Reference was made to the discontinuation of the Housing Subsidy System in Wales. A buyout of the Subsidy System had been negotiated with the Treasury by Welsh Government, and the impact for Denbighshire would be a capital sum of £40m which would be borrowed on as specific date. The Chief Account explained that the buyout figure would represent a better deal than the Subsidy ... view the full minutes text for item 12. |
|
SCRAP METAL DEALERS ACT 2013 PDF 55 KB To consider a report by Councillor David Smith (copy enclosed) on a revised regulatory regime for the scrap metal dealing and vehicle dismantling industries. Decision: Councillor David Smith presented the
report, circulated previously, which detailed the provisions of the Scrap Metal
Dealers Act 2013 and requested the approval of suggested delegated powers and
fee setting for the Authority. RESOLVED:- that Cabinet approves:- (a)
the delegation of the powers under the Scrap
Metal Dealers Act to the Head of Planning and Public Protection. (b)
the delegation of the decision of the adoption of the fee
level for Scrap Metal licences to the Head of Planning and Public Protection,
with approval from the Lead Member, and (c)
the Head of Planning and Public Protection
examine the legislation pertaining to the displaying of identity badges by
Scrap Metal Dealers. Minutes: Councillor David Smith presented the report, circulated previously, which detailed the provisions of the Scrap Metal Dealers Act 2013 and requested the approval of suggested delegated powers and fee setting for the Authority. The HPPP explained that the Scrap Metal Dealers Act 2013 repealed the Scrap Metal Dealers Act 1964 and Part 1 of Vehicles (Crime) Act 2001 and brought forward a revised regulatory regime for the scrap metal dealing and vehicle dismantling industries, providing the Council with a strong legislative framework to empower the Council and Police in the fight against offenders who wilfully plunder the Country of metal, whilst also strengthening and supporting legitimate scrap metal dealers. The regulation of scrap metal dealers had been revised to address the major impact of metal theft on the economy, with the introduction of the Scrap Metal Dealers Act 2013. The Act provided Local Authorities with the power to better regulate these industries by providing a power to refuse to grant a licence and revoke licences if a dealer was considered unsuitable. Unsuitability would be defined by a number of factors including any relevant criminal convictions. The Act would provide Local Authorities (LA’s) and Police Officers with suitable powers of entry, inspection and to close down unauthorised sites. The Act would create two different
types of Scrap Metal Licence, either a “Site Licence” or a “Mobile Collectors
Licence”. Mobile Collectors would be required
to have a licence in every LA area in which they operated. The Natural Resources Body for Wales would
maintain a public register. Dealers
currently registered under the Scrap Metal Dealers Act 1964, or a motor salvage
operator already registered under the Vehicles (Crime) Act 2001, would be
permitted to continue to operate legally, providing that they applied for a
licence under the new Act by the 15th October, 2013. Existing Licences would be valid until a new
licence was issued, and transitional arrangements had been implemented via a
Commencement Order. The HPPP explained that after the 1st October, 2013 applicants not registered under the Scrap Metal Dealers Act 1964 or the Vehicles (Crime) Act 2001would be unable to trade legally until a licence had been issued. Full enforcement of the provisions in the 2013 Act would commence from the 1st December, 2013. Under the 1964 Act LA’s had to register anyone notifying them that they were operating as a scrap metal dealer. Under the 2013 Act LA’s would be able to refuse to grant a licence where the applicant was judged not to be unsuitable to operate as a scrap metal dealer. Guidance had been made available on assessing the suitability of applicants. Where the Council considered it
necessary to refuse to issue, vary or revoke a licence, the applicant or
licensee would be afforded the opportunity to make oral representations. The Local Government Association (LGA)
Guidance regarding the Act recommended that the LA Licensing Committee, as the
appropriate body, should hear representations.
Persons aggrieved by a decision can appeal to the Magistrate’s Court. The granting of uncontested
applications, or in cases where there were no questions about the suitability
of an applicant, could be delegated to Licensing Officers. Other powers contained in the Act
provide for:- ·
Licences to be
displayed ·
Dealers to carry out
identity checks on scrap metal providers ·
Dealers to keep
records of any scrap received or disposed of ·
Prohibition of cash
payments. Payment can only be made by non-transferable cheque or transfer of
funds ·
Local Authorities and
Police to enter and inspect licensed premises ·
Variation of or
refusal to vary a licence ·
Revocation of a
licence · Closure of sites through ... view the full minutes text for item 13. |
|
CABINET FORWARD WORK PROGRAMME PDF 103 KB To receive the enclosed Cabinet Forward Work Programme and note the contents.
Decision: Councillor H.H. Evans presented the Cabinet Forward Work Programme. RESOLVED - that Cabinet receive the Forward Work Programme, subject to the agreed
amendments. Minutes: Councillor H.H. Evans presented the Cabinet Forward Work Programme, circulated with the papers for the meeting. Cabinet agreed with a suggestion by Councillor D.I. Smith that, in view of Lead Member involvement in Scrutiny, the Forward Work Programmes for each of the Scrutiny Committees be included as an agenda item for future Cabinet meetings. The Corporate Director: Economic and Community Ambition explained that Vibrant and Viable Places – Funding bid for Rhyl Town Centre Projects agenda item, scheduled for the 29th October, 2013, would now be deferred to a future meeting. Members were informed that the Procurement item relating to the Business Case for the Combined Denbighshire and Flintshire Service would be submitted to the November, 2013 meeting, and the Outline Case for the Three County’s would be submitted to the December, 2013 or January, 2014 meeting. RESOLVED - that Cabinet receive the Forward Work Programme, subject to the agreed
amendments. PART II exclusion of press RESOLVED
– that under Section 100A of
the Local Government Act 1972, the Press and Public be excluded from the
meeting for the following item(s) of business on the grounds that they involve
the likely disclosure of exempt information as defined in Paragraphs 14 and 15
of Part 4 of Schedule 12A of the Local
Government Act 1972. |
|
CONTRACT AWARD FOR OUTSOURCING STORES (HOUSING) To consider a report by Councillor Hugh Irving (copy enclosed) which provides an overview of the reason to outsource stores and material supply chain and to recommend a preferred contractor to provide this service going forward. Additional documents:
Decision: Councillor Hugh Irving presented the
report, circulated previously, which provided an overview of the reason to
outsource stores and material supply chain, and to recommend a preferred
contractor to provide the service going forward. RESOLVED - that Cabinet approves the selection of Jewson as the preferred
contractor to supply stores and materials to the Housing Service for a period
of 3 years with an option to extend for a further year if required. Minutes: Councillor Hugh Irving presented the report,
circulated previously, which provided an overview of the reason to outsource
stores and material supply chain, and to recommend a preferred contractor to
provide the service going forward. Councillor
Irving provided a detailed summary of the report and explained that Housing
Services had commissioned a review of the stores function which had been
undertaken by Cirrus Purchasing, Appendix A, to assess the current position and
make recommendations as to the preferred option which would offer best value
for money for the service and its customers.
The key themes which characterised the current in house stores and
direct material supply service had been summarised in the report. Based on the current and future operating
environment and requirements there were 3 primary supply chain models, Options
A, B & C, for the future supply chain solution. ·
Option
A – Modernise and Optimise the in house stores function. ·
Option
B - Contract
with merchant to provide a main supplier model. ·
Option
C – Develop a network model trading with multiple local suppliers directly As the costs and complexity of bringing the in house stores
service up to top quartile performance would be disproportionate, it had been
agreed to pursue option B as the preferred source for the provision of stores
and materials. A formal tendering
process had been undertaken which had resulted in 2 supplier bids being
appraised by officers, operatives and the Chair of the Tenants Federation. Following a financial and qualitative
appraisal, Appendix B, a preferred bidder had been identified and details of
the bids had been summarised in the report.
The tender had required suppliers to provide costs for a basket of
materials and supplies, comprising 282 of the most purchased materials, which
resulted in costs being less than existing stores provision. The outsourcing proposal provided for a significant net
benefit to the Housing Service and to the private sector more broadly. The loss of income to the Stores, Highways
and Environmental Services had been estimated at £67k, equating to
approximately 33% of income received by Stores.
Savings achieved by Housing of £15,232 from no longer using Denbigh
depots would be apportioned to other depot users which would mean the HRA
achieved savings with on costs being spread over existing services. Highways and Environmental Services would
also benefit from services using the Coms system with an overhead of 12.5%
added when services procure sub-contractors and direct supplies via Coms. In 2012/13 the charge had equated to £23,861
for Housing, representing 19% of the total Coms overheads charged. Details of the Equality Impact Assessment undertaken, the
risks and steps implemented to reduce them, Chief Finance Officer Statement and
consultation process had been included in the report. Confirmation was provided that, as part of
the consultation exercise, tenants had been involved in the selection of the
preferred contractor. In response to questions from Members, the Head of Housing
and Community Development explained that the competitive prices quoted had been
agreed for a period of six months and would be reviewed annually. He also provided details of staffing
arrangements and the discussions undertaken with TUPE. RESOLVED - that Cabinet approves the selection of Jewson as the preferred
contractor to supply stores and materials to the Housing Service for a period
of 3 years with an option to extend for a further year if required. |