Agenda item
APPLICATION NO. 01/2022/0523/ MA - GRAIG QUARRY, GRAIG ROAD, DENBIGH, LL16 5US
To consider a consolidating application for the extension of winning and working of limestone, importation of inert waste and restoration to amenity land at Graig Quarry, Graig Road, Denbigh (copy attached).
Minutes:
An application was submitted for the
extension of winning and working of limestone, importation of inert waste and
restoration to amenity land at Graig Road, Denbigh.
The Chair asked the Legal Officer to read through
some late representations received from Welsh Government.
The Legal Officer informed Members that the
Planning Authority was in receipt, as of this morning, of a holding direction
from the Welsh Government under article 18 of the Town and Country Planning
Development Management Procedure Wales Order 2012. It was in respect of a
consolidating application for the extension of winning and working of
limestone, importation of inner waste and restoration to amenity land at Graig Quarry, Graig Road Denbigh.
The letter stated the Welsh Ministers had
been asked to call-in the application for their own determination. Article 18
of the Town and Country Planning Development Management Procedure Wales Order
2012 enabled the Welsh Ministers to give direction restricting the grant of
permission by a local planning authority.
The letter permitted the author permission
on behalf of the Minister for Climate Change to officially direct Denbighshire
County Council, effective from the date stated on the letter, not to grant
planning permission in respect of, A- application no 01/2022/0523/ MA or, B-
any development of the same kind which was the subject of the application on
any site which formed part of or included land to which the application
relates, without the prior authorisation of the Welsh Ministers. The direction
would enable further consideration to be given to whether or not the
application should be referred to the Welsh Ministers for determination. The
direction prevented Denbighshire County Council only from granting planning
permission, it did not prevent the authority to continue to process and consult
on the application. It did not prevent
the authority refusing the application if it so determined.
The letter referred to article 31 which
provided for the Welsh Ministers to vary or cancel the direction in relation to
the land and type of development covered. The authority would be informed on
the decision of the Welsh Ministers on whether the application was being called
in as soon as it was made.
The Development Control Manager clarified
that Welsh Government do hold the power to issue a holding direction to a local
authority. It prevents the authority in granting planning permission
until the Welsh Government had assessed the proposal. It does not prevent the
local planning authority processing the planning application. Welsh Government
would, in any case, ask the authority what decision the Planning Committee
would have made on the application as part of its determination.
The local authority was not permitted to
issue a grant of planning permission based on the holding direction.
The Chair thanked the Legal Officer and
Development Control Manager for clarifying the meaning of the letter.
Public
Speaker –
Mair Jones (AGAINST) – She stated Crest fields and woods was a cherished place.
The facts and measurements included in the report did not identify the area.
She stressed 284 individuals had made legitimate objections against the
proposal. If the planning policy had been followed through a place making
process, the feelings of the Crest area, its positive impact on individual’s
health and wellbeing would have been considered at the outset and not
dismissed.
The Council had agreed to extend the
quarry’s operation and not the footprint of the site. She questioned if a
promise had been made at that stage that operations would cease in 2028 and the
extension allowed on those grounds. She stressed Breedon
(applicant) wanted to extend the operations for another 25 years at the site.
In her opinion she felt the committee should assess the application as if it
was a new quarry. The report stated the nearest residential property was over
250m from the proposed extended quarry boundary, outside the recommended 250m
buffer zone. Currently there was 34 properties within the 250m buffer, some
properties would be 90m from the proposed new boundary. Reference to a bill
currently being received by Westminster proposed a distance of 1000m from homes
due to the toxic effect of mining.
A loss of 4 hectares of Best and Most Versitile (BMV) agricultural land in a climate emergency
would be a travesty including the loss of any trees. Objectors questioned
officers understanding of chapter 6 (of Planning Policy Wales) when the
destruction of the nature corridor was dismissed. Local scientist stated she
‘fundamentally refute the officer’s assertion that some nature development
during restoration after 25 years meets the criteria of net benefit for
biodiversity today’.
The objector questioned why one third of our
aggregate was being sent to England. She questioned why the report stated that
Denbigh was the most strategically placed limestone provider, when the regional
aggregate statement stated that limestone was more abundant in Flintshire.
This application failed to improve the
economic, social, environmental and cultural wellbeing of the area. It did not
contribute to the statutory wellbeing goals.
She stressed she was confident an
independent professional would successfully challenge the report and its conclusions.
Malcolm Ellis (FOR) – He thanked Members and the Chair for allowing him to speak
in favour of the application. The application presented was to provide
limestone for the area for the next 20 years. It would provide benefits to the
economy and the community to reduce carbon footprint and to confirm
sustainability. If approved the proposal would give a future to the quarry and
provide job security to 100 workers. The proposal would ensure a supply of
limestone to the area as opposed to from other quarry’s such as Derbyshire
providing Limestone to the area.
He stressed Breedon
did not want to increase the lorry movement to and around the site. The intention where possible was to use local
businesses and contractors to promote local economy. Which in turn would have a
positive effect on reducing the carbon footprint. The application included a
final restoration which would increase biodiversity and ecology which would
provide an improvement to the woodland area and animals currently residing there.
Breedon and the land owner had included several
improvements to public footpaths including servicing and maintenance of the
footways. The intention had also to be include further footpaths to the North
of the site.
The Chair thanked both speakers for addressing
the committee.
He informed Members the site had been
subject to a site visit that had taken place on 8 December 2023. He thanked
Members for attending the site and was beneficial to those in attendance.
Councillor Delyth Jones who had been in
attendance at the site visit felt the meeting was very valuable and beneficial.
She felt the fact the site had been pegged out was extremely helpful for
members to see first-hand the intentions.
Councillor Parry echoed the thoughts of
Councillor Jones. He thanked officers and the operator for arranging the visit.
General
debate –
Councillor Delyth Jones (Local Member)
thanked the Chair for the opportunity to address the committee. She thanked
both speakers for attending the meeting to provide input to the process and
discussions.
She reminded Members the quarry had been
active close to the site for a considerable time. Currently a 28-hectare site
with planning controls in place since 1948 which included a variation of time
limiting conditions as recent as 03 October 2022 was approved.
Attention was drawn to Planning Policy Wales
11 section 3.58 and 3.59 which obliged weight to be given to protecting Agricultural land of grades 1, 2 and 3a of the Agricultural
Land Classification system. It noted this land was considered the best and most
versatile and land of that quality should only be developed if there was an
overriding need for the development. Land on the proposed application was cited
as 1.5 hectares of grade 2 land and 2.5 hectares’ grade 3A.
The site of the application is
located outside the designated development boundary in the current Local
Development plan (LDP) and was in close proximity to the Crest Mawr Wood a Site of Special Scientific
Interest.
Planning Policy Wales 11 stated
‘Extensions to existing mineral working, whether they be time, lateral or depth
extensions should be considered in the same manner as applications for new
sites. Each application will need to consider the impact on the site as a whole
and the wider surroundings and will need to be considered on its own
merits.’
The application argued the need
for the limestone assessed on the currently adopted LDP, and to currently
assess need of a sub region of the same LDP. She acknowledged a certain level
of material was required to support the local construction industry. Councillor
Jones argued, as stated in the Minerals Technical Advice Note 1 (MTAN1), this
need could not result in an unacceptable detriment of the environment or
amenity. The assessment of housing need conducted as part of the current LDP
was circa 7500 homes for Denbighshire, a figure now known was greatly over
calculated.
Councillor Jones shared figures
under discussion for Denbighshire as part current soon to be completed review
of the revised LDP. The current preferred development strategy reviewing the
level of growth for housing over the period 2018- 2033 was seen to be 3275
homes. Less than half of the current LDP. She informed Members up to 1st
April 2023, a sum of 1483 properties had been constructed and a further 878
under construction or with agreed planning permission.
The current Regional Technical
Statement second review (RTS2), stated with regards to Denbighshire local
authority area the RTS2 did not require Denbighshire to make any crushed rock
allocations based on the permitted reserves.
She informed the committee an
application of a nearby quarry in Flintshire had recently been approved.
She urged Members to take into
consideration the 271 objections against this application when coming to a decision
today.
Councillor Pauline Edwards
(Local Member) stressed her support for the statement Councillor Jones had
shared with the committee. She stressed the objections had included those from
Dr James Davies MP, Mr Llyr Gruffydd
Member of Senedd and Denbigh Town Council. Concerns
raised had included concern on the increase dust, noise and harmful particles
in the air, loss of footpaths and green space including local ecosystems with
no benefit to the local people. The concerns raised by the local residents were
all part of the Wellbeing of Future Generations Wales Act 2015.
She stressed the application was
contrary to Denbighshire County Council’s target of climate change and
decarbonisation.
In response to the Local Members
detailed statements the Development Control Manager informed Members that
minerals and waste planning applications were assessed and processed by the
North Wales Minerals and Waste Shared Planning Service. Flintshire County
Council are the lead Authority for this Service and assisted Denbighshire
County Council (DCC) with such applications. He introduced Hannah Parish,
Manager of the North Wales Minerals and waste Shared Planning Service, who had
been the case officer for this application.
The Manager of the North Wales
Minerals and Waste Shared Planning Service responded to some of the points
raised by the Local Members by stressing the application had taken a long time
to process. This was largely due to the need to obtain the surveys required to
support the environmental statement. External consultation with professional
consultees had taken place. Within the recommended conditions it was suggested
prior to any development within each phase further ecological surveys would be
required.
Local Members raised concern the
proposal would remove 4 hectares of best and most versatile agricultural land.
The report noted that the department in Welsh Government that was concerned
with agricultural land did not object to the application stating there was an
overriding need for the aggregate that would outweigh the removal of
agricultural land.
When the Denbighshire LDP, was being prepared, the evidence based
used to consider if a new allocation for crushed rock was the Regional
Technical Statement published in 2009.
Since the adoption of the Denbighshire LDP, a further two
reviews had been published. The Regional Technical Statement Second
Review (RTS2) also allowed for regional collaboration should a particular
authority not be able to make their required apportionment. Whilst there is no current need for
Limestone aggregate in Denbighshire, on a sub-regional level there is a
demonstrable need.
When the current adopted LDP was
being developed there was no need so no allocation was required. It would not
be appropriate for a quarry to be located within the development plan boundary
due to the proximity to residential properties. It was stressed there are no
residential properties within the 200m mineral buffer zone and the proposed
extension area would not be closer to residential properties.
A management plan is required to be completed
as part of an existing section 106 agreement for the management of the Crest Mawr Site of Special Scientific Interest. Should planning
permission be granted, the existing section 106 legal agreement would be
amended by a deed of variation to ensure the obligation to manage the woodland
would continue. It was stressed the proposal had been assessed as a new
application with a number of technical documents.
Members heard there was a team
from the Shared Service that monitor the conditions and ensure the conditions
are being adhered too.
The proposal included woodland
planting in the restoration which would aid any offset of carbon dioxide.
In further discussions Members stressed
the increase in carbon dioxide and impact it would have on the climate
emergency declared by the authority. Members requested any subsequent reports
or consultations be presented to the committee if the application was granted.
It was also discussed the type
of lime that would be mined was not the correct lime that would be used
agriculturally. The lime particles would be the wrong size and too big to
breakdown quick enough.
The Senior Highway Engineer
stated if granted the proposal would not create any additional vehicle or
traffic on the highway network, over and above what had previously been deemed
acceptable in planning terms from previous applications. As a result, there
would be no significant change in vehicle activity to the current and ongoing
arrangements.
Officers stressed the difficulty
in stating if the proposal would have an impact on the level of carbon
footprint of Denbighshire. There would always be conflicting issues for this
type of proposal.
Numerous Members were supportive
of the Local Members and the reasons highlighted against the application. The
amount of conditions presented alongside the application was noted. Members
also stressed that the application was for a new quarry. Members asked for clarification that if Denbighshire
had no need for aggregate at the current time, was there another authority that
was in need of such aggregate.
In response to Members comments
the Manager of the North Wales Shared Minerals and Waste Planning Service
stressed minerals could only be worked where they are found. Denbighshire
imports minerals that do not occur within Denbighshire such as rock salt and
therefore deficiency would have to be sourced from other areas.
The minimum requirement for a landbank of crushed rock is calculated by using the local
development plan period(15 years) plus ten years.
The application was being
considered as a new application in regards to collection of information and
reports.
The Development Control Manager
reminded Members that Welsh Government had issued the holding order and could
take the decision out of the committees’ power and make the decision. If the
application was refused there was also the right of appeal which would mean a
Welsh Minister or Planning Inspector would make the decision based on evidence.
He stressed to members the importance of providing evidence to support any
reasons to refuse the application.
Officers stressed that 44% of
the material sourced at the quarry is used as agricultural lime. Therefore, a
large proportion of the minerals exported from the quarry is not being used as
an aggregate in construction.
Proposal – Councillor Delyth Jones proposed the
application be refused contrary to officer recommendation, seconded by
Councillor Arwel Roberts.
Councillor Delyth Jones outlined her reasons
for refusal as follows:
·
The
negative impact on the protected species and the environment. In particular,
the impact of the species within the Site of Specific Scientific Interest.
·
The
application is outside of the Local Development boundary.
The Development Control Manager
emphasised that the authority would not be issuing a decision notice on this
application due to the holding direction from Welsh Government. The precise wording
for the refusal would be agreed with the proposer and seconder before submitted
to Welsh Government.
Members asked if an additional
reason for refusal on the negative impact of local residents could also be
included as a factor for refusal.
Councillor Delyth Jones was in
agreement that a third reason for refusal, that being the negative impact upon
the amenity and well-being of local residents be added to the reasons for
refusal. Councillor Arwel Roberts was in agreement. The third reason agreed was:-
·
The
impact the development could have on the amenity of nearby residents
The Legal Officer outlined the
vote and how the responses would be recorded.
Vote –
For – 16
Against – 0
Abstain – 1
RESOLVED that permission be REFUSED contrary to
officer recommendation for the reasons as stated above.