Agenda, decisions and draft minutes
Venue: Council Chamber, County Hall, Ruthin and by video conference
Media
Webcast: View the webcast
No. | Item |
---|---|
APOLOGIES Additional documents: Decision: There were no
apologies. Minutes: There were no
apologies. |
|
DECLARATION OF INTERESTS PDF 116 KB Members to declare any personal or prejudicial interests in any business identified to be considered at this meeting. Additional documents: Decision: Councillor Gill German – Personal Interest – Item 5 Councillor Rhys Thomas – Personal Interest – Items 5 and 7 Minutes: Councillors Gill German and Rhys Thomas declared a personal
interest in agenda item 5 – Central Rhyl and Central Prestatyn Coastal Defence
Schemes, in so far as it related to Denbighshire Leisure Limited (DLL), as they
were Directors of DLL. Councillor Rhys Thomas also declared a personal interest in
agenda item 7 – Ysgol Plas Brondyffryn Project because he lived near to the
school. |
|
URGENT MATTERS Notice of
items which, in the opinion of the Chair, should be considered at the meeting
as a matter of urgency pursuant to Section 100B(4) of the
Local Government Act 1972. Additional documents: Decision: No urgent matters had been raised. Minutes: No urgent matters had been raised. |
|
To receive the minutes of the Cabinet meeting held on 29 September 2022 (copy enclosed). Additional documents: Decision: RESOLVED that the minutes
of the meeting held on 29 September 2022 be received and confirmed as a correct
record. Minutes: The minutes of the Cabinet meeting held on 29 September 2022
were submitted. RESOLVED that the minutes
of the meeting held on 29 September 2022 be received and confirmed as a correct
record. |
|
CENTRAL RHYL AND CENTRAL PRESTATYN COASTAL DEFENCE SCHEMES PDF 138 KB To consider a report (which includes two confidential appendices) by Councillor Barry Mellor, Lead Member for Environment and Transport (copy enclosed) regarding two potential coastal defence schemes for Central Rhyl and Central Prestatyn and seeking Cabinet approval to present the project to Council with a recommendation to fund the construction phase of both schemes. Additional documents:
Decision: RESOLVED that Cabinet – (a) confirms that it has considered the
content of the Well-being Impact Assessments for each scheme (attached at
Appendix 3a and 3b to the report); (b) supports the proposal to progress the
Central Rhyl Coastal Defence scheme to the construction phase, using the grant
aid funding model set out by the Welsh Government, and agrees to the proposal
being presented to Council for a decision; (c) supports the proposal to progress the
Central Prestatyn Coastal Defence scheme to the
construction phase, using the grant aid funding model set out by the Welsh
Government, and agrees to the proposal being presented to Council for a
decision, and (d) delegates authority to the Coastal
Defence Project Board to deliver the schemes. Minutes: Councillor Barry Mellor presented
the report regarding two potential coastal defence schemes for Central Rhyl and
Central Prestatyn and sought Cabinet approval to present the project to Council
with a recommendation to fund the construction phase of both schemes. The report included two confidential
appendices detailing financial information and Cabinet was asked to move into
private session in the event they were minded to discuss the confidential
elements of the documentation. The Corporate Director: Economy
and Environment, Section Manager – Network Management and the Coastal Defence
Consultant were also present for this item. An update on the development of the two schemes was provided in order to reduce flood risk in the Central Rhyl and Central Prestatyn areas. The Council had worked closely with the Welsh Government on the development of the schemes and a final business case would be submitted shortly for Welsh Government approval. The combined cost of both schemes was approximately £84m with 85% funded by the Welsh Government as grant in aid paid to the Council over a 25-year period through the Revenue Support Grant. Extensive consultation on both schemes had been carried out and Communities Scrutiny Committee and the Budget Board had scrutinised the proposed schemes and supported submission of the project for approval. Planning permission had been granted for both schemes in July 2022. The reasoning for the schemes was further explained with reference to the impact of climate change, deterioration of existing flood defences and the devastation of flood events. The success of the East Rhyl Coastal Defence Scheme was also highlighted and lessons learned from that project. The Central Rhyl Scheme was designed to significantly reduce flood risk to approximately 600 residential and commercial properties and the Central Prestatyn Scheme was designed to protect over 2000 residential and commercial properties; both schemes were crucial to the security and sustainability of those towns for residents, businesses and tourism. The following matters were raised during the ensuing debate – · Councillor Gill German was keen to ensure concerns expressed by residents (following press reports) who lived close to the Central Prestatyn Scheme had been addressed. She was advised that most of those concerns had been based on a misunderstanding of the plans. Officers had engaged with residents to give assurances in that regard and clarified that the scheme was much further away from the boundary of their properties than reported in the press with further adjustments made to extend that distance, and there had been no plans for a walkway/cycleway on top of the bund which had been a further concern · the Leader and Councillor Gill German (ward members) advised they had been in the area recently actively speaking to residents together with the third ward member Councillor Kelly Clewett, and no concerns had been raised regarding the Central Prestayn Scheme. Whilst it had been pleasing to note the comprehensive engagement which had already taken place, the Leader stressed the importance of continual proactive engagement and dialogue with members and residents going forward, particularly given the inevitable disruption caused as a result of the construction phase. Assurances were given that, if the schemes were approved, further discussions would take place on the detail of the schemes and programme of delivery. Similar engagement measures to those undertaken during the East Rhyl Coastal Defence Scheme were proposed which included regular newsletters and a drop-in facility · Councillor Rhys Thomas referred to the Central Rhyl Scheme and concerns regarding the detrimental impact on the operation of Denbighshire Leisure Limited’s (DLL) facilities such as SC2, alongside other proposed regeneration works in the area, with the need to minimise the impact ... view the full minutes text for item 5. |
|
To consider a report by Councillor Barry Mellor, Lead Member for Environment and Transport (copy enclosed) seeking Cabinet approval to introduce a proposed new scheme of delegated decision making for land acquisition for carbon sequestration and ecological improvement purposes taking into account the recommendations of Communities Scrutiny Committee. Additional documents:
Decision: RESOLVED that Cabinet – (a) approve the introduction of the new scheme
of delegated decision making for land acquisition (freehold/leasehold) for
carbon sequestration and ecological improvement purposes as proposed in
Appendix 3 to the report, and (b) confirms that it has read, understood and
taken account of the Well-being Impact Assessment, as detailed in Appendix 4 to
the report, as part of its consideration. Minutes: Councillor Barry Mellor presented
the report seeking Cabinet approval to introduce the proposed new scheme of
delegated decision making for land acquisition for carbon sequestration and ecological
improvement purposes, having taken into account the recommendations of the
Communities Scrutiny Committee, to allow land to be more promptly and
effectively acquired so that the Council delivered on its Climate and
Ecological Emergency declaration and associated targets. Cabinet’s original decision in
February 2022 to approve the proposed scheme of delegation had been subject to
call-in. At its meeting in July, Cabinet
had agreed to reconsider its original decision taking into account the recommendations
of the Communities Scrutiny Committee.
The report addressed the Scrutiny Committee’s recommendations which
included seeking consultation responses from key organisations; amending
wording in the proposed scheme of delegation in so far as it related to
liaising with local councillors and Member Area Groups; undertaking a review of
staffing resources in Countryside Services at the appropriate time to ensure
sufficient capacity to deal with the additional future duties, and the
provision of detailed information on agricultural land grading in Denbighshire. The Climate Change Programme Manager summarised the report and confirmed that each of the Scrutiny Committee’s recommendations had been addressed. She also drew attention to the Council’s Net Carbon Zero and Ecologically Positive 2030 targets and rationale for acquisition for purposes of carbon sequestration and ecological improvement. Councillor Mellor added that Councillor Huw Williams, Chair of Communities Scrutiny Committee had been satisfied that the issues raised by the Scrutiny Committee had been addressed. However, he had also asked that members be kept informed of any land acquisition when it took place, which Councillor Mellor considered a reasonable request. The Leader thanked Councillor Huw Williams and Communities Scrutiny Committee for their work which had led to the current outcome. Councillor Emrys Wynne also welcomed the review and highlighted the value of scrutiny and its importance in the Council’s processes.
RESOLVED that Cabinet – (a) approve the introduction of the new scheme
of delegated decision making for land acquisition (freehold/leasehold) for
carbon sequestration and ecological improvement purposes as proposed in
Appendix 3 to the report, and (b) confirms that it has read, understood and
taken account of the Well-being Impact Assessment, as detailed in Appendix 4 to
the report, as part of its consideration. |
|
YSGOL PLAS BRONDYFFRYN PROJECT - SCHOOL ORGANISATION FORMAL CONSULTATION REPORT PDF 256 KB To consider a report by Councillor Gill German, Lead Member for Education, Children and Families (copy enclosed) on the findings of the formal consultation to increase the capacity from 116 to 220 at Ysgol Plas Brondyffryn and seeking Cabinet approval for publication of a statutory notice for Denbighshire County Council to increase the capacity from 116 to 220 at Ysgol Plas Brondyffryn from 1 September 2024 subject to the new build being ready. Additional documents:
Decision: RESOLVED that Cabinet – (a) note the findings of the
formal consultation to increase the capacity from 116 to 220 at Ysgol Plas
Brondyffryn; (b) approve the publication
of a statutory notice for Denbighshire County Council to increase the capacity
from 116 to 220 at Ysgol Plas Brondyffryn from 28 April 2025. The implementation of the proposal will be
subject to a site being agreed, planning consent being given, finance being
available and the new build being ready, and (c) confirms that it has
read, understood and taken account of the Well-being Impact Assessment, as
detailed in Appendix 1 to the report, as part of its consideration. Minutes: Councillor Gill German presented the report on the findings
of the formal consultation on the Ysgol Plas Brondyffryn project and sought
Cabinet approval to the publication of a statutory notice for the Council to
increase the capacity from 116 to 220 at Ysgol Plas Brondyffryn. She also referred to an amendment to report
recommendation 3.2 to incorporate a revised implementation date of 28 April
2025. The project was part of the Welsh Government’s
Sustainable Communities for Learning Programme (Band B) approved in September
2020. The school currently provided
specialist provision for pupils with autism aged 3 – 19 across four sites in
Denbigh. It was proposed to bring all
sites together in a purpose built building in a field next to Denbigh Leisure
Centre and currently used by Denbigh High School, and to increase capacity of
the school as demand for those specialist places increased. Details of the consultation responses had
been set out in the report together with the consultation report and supporting
documentation. The Head of Education and Principal Manager –
School Support elaborated on the proposal to increase the school’s capacity
based on the predicted increased demand and current capacity issues. Discussions had been ongoing with Welsh
Government during development of the business case with much work undertaken to
ensure the right size for the school going forward and a clear pathway for
gradually increasing pupil numbers at the school and admission arrangements. Cabinet welcomed the proposal to increase the
capacity of the school to meet the growing demand for places. Main areas of debate focused on the following
– ·
the need
to create more opportunities for school leavers with learning disabilities was
highlighted by Councillor Elen Heaton.
It was confirmed the current design for the school did include a
community café which aimed to provide increased community engagement in the
school and opportunities for pupils with learning disabilities, particularly in
post 16 provision, to use the new facilities and develop social skills and
links with the wider community. There
were already primary schools in the county with café areas and other models in
the third sector with adults with additional learning needs. However, safeguarding of pupils was paramount
and if that could not be guaranteed, then it would not be pursued ·
Councillor
Rhys Thomas raised concerns regarding the wording of report recommendation 3.2
and sought clarity on specific elements within the School Organisation Code and
how it related to the proposal, particularly with regard to specifying a
location for the school, concerns over the consultation process alongside the
separate pre-planning consultation for the proposed new school site, and
concerns over the proposed site itself. A special Denbigh Member Area Group
meeting had been arranged to discuss the site selection process and concerns in
that regard. Consequently, he felt there
would be merit in deferring publication of the notice or rewording recommendation
3.2 to ensure clarity regarding the current process and decision making. Councillor Gill German stated her preference
for an amendment for clarity rather than deferral given the timescales involved
and potential impact on progressing other projects. The Monitoring Officer provided legal advice on
those points, and subsequent points raised to clarify other processes, as
follows – ¨ the proposal was not for a new school; the proposal
was to increase the capacity of an existing school, so the provisions of the
School Organisation Code related to the notice and consultation in so far as
they related to the alteration of an existing school, not the creation of a new
school ¨ with regard to publication of the notice, or deferring publication of the notice, the ... view the full minutes text for item 7. |
|
DISTRICT HEATING SYSTEM BETWS GWERFIL GOCH PDF 149 KB To consider a report by Councillor Rhys Thomas, Lead Member for Housing and Communities (copy enclosed) regarding the potential of a district heating system for the village of Betws Gwerfil Goch incorporating the provision of ground source heat pumps to council and privately owned dwellings and seeking Cabinet approval to appoint the Contractor, Kensa to proceed with the design stage of the project. Additional documents: Decision: RESOLVED that Cabinet
note the updated engagement activity and approve the appointment of the
Contractor, Kensa to proceed with the design stage of
the project. [This stage of the project
will take 12 – 16 weeks.] Minutes: Councillor
Rhys Thomas presented the report on a district heating system project for the
village of Betws Gwerfil Goch incorporating the provision of ground source heat
pumps (GSHP) to council and privately owned dwellings. Cabinet approval was sought to appoint a
contractor to proceed with the design stage of the project. Some
background to the project was provided including the opportunity to extend
retrofit works to private home owners in off grid/hard to heat areas and
rationale behind choosing Betws Gwerfil Goch for the scheme. A technical partner (Kensa) had been selected
via the Welsh Procurement Alliance framework and initial feasibility studies
supported the viability of the scheme.
100% grant funding had been secured from the Welsh Government to cover
the cost of the private dwelling GSHPs in the area on the understanding the
project would be delivered in 2022/23. Community
engagement would be key to successful delivery of the scheme and the Senior
Architect elaborated on the consultation and engagement activities to date
which had been well received with further plans to engage with non-respondents. She also provided an outline of the scope of
the design works and requirements for individual properties, and the council
would also undertake survey works to produce the ‘passport’ element of the scheme
for future years. Cabinet
welcomed the innovative project and benefits it would bring both to residents
in terms of energy efficiencies and cost saving and also in terms of the
climate change agenda with renewable energies and carbon reduction. The project reflected the Council’s ambitions
and its forward thinking and provided an exciting opportunity for Betws Gwerfil
Goch. If the project was delivered
successfully in such difficult circumstances and remote location the thinking
was that it could be delivered almost anywhere in the county, and Cabinet was
pleased to note the potential opportunity for the pilot project to be rolled
out to other villages with similar challenges.
It was also noted that if any residents did not join the scheme at the
outset they would still be able to join at a later date given that the energy
infrastructure would already be in place, although they would need to bear the
costs for the heat pump. Tribute was
also paid to officers for their hard work in securing funding for the scheme
and supporting its delivery within the tight timescales specified by the Welsh
Government. RESOLVED that Cabinet
note the updated engagement activity and approve the appointment of the
Contractor, Kensa to proceed with the design stage of the project. [This stage of the project will take 12 – 16
weeks.] |
|
ANNUAL TREASURY MANAGEMENT (TM) REPORT 2021/22 PDF 125 KB To consider a report by Councillor Gwyneth Ellis, Lead Member for Finance, Performance and Strategic Assets (copy enclosed) updating Cabinet on the performance of the treasury management function and to demonstrate compliance with treasury limits and Prudential Indicators during 2021/22. Additional documents:
Decision: RESOLVED that Cabinet – (a) note the performance of the Council’s
Treasury Management function during 2021/22 and its compliance with the required
Prudential Indicators as reported in the Annual Treasury Management Report
2021/22 (Appendix 1 to the report), and (b) confirms it has read, understood and taken
account of the Wellbeing Impact Assessment (Appendix 2 to the report) as part of
its consideration. Minutes: Councillor
Gwyneth Ellis presented the report updating Cabinet on the performance of the
treasury management function and demonstrating compliance with treasury limits
and Prudential Indicators during 2021/22.
The purpose of the report was to provide assurance in respect of the
Council’s treasury management activities. The
Head of Finance and Property highlighted the importance of treasury management
and referred to the economic background and impact on treasury management
activities. He highlighted the main
points for members in terms of borrowing and investment activity and confirmed
compliance with all prudential indicators set, guiding members through those
indicators as detailed in Annex B confirming appropriate ratios of financing
costs and borrowing levels within limits.
It was noted that the Governance and Audit Committee monitored the
treasury management function and had accepted the report. A training session on Treasury Management
organised with Treasury Management Consultants Arlingclose had been arranged
for 28 October 2022, which all members had been invited to attend. The
Leader acknowledged the comprehensive report and importance of the robust
procedures in place for dealing with the treasury management function and work
of the Governance and Audit Committee in that regard. RESOLVED that Cabinet – (a) note the performance of the Council’s
Treasury Management function during 2021/22 and its compliance with the
required Prudential Indicators as reported in the Annual Treasury Management
Report 2021/22 (Appendix 1 to the report), and (b) confirms it has read, understood and taken
account of the Wellbeing Impact Assessment (Appendix 2 to the report) as part
of its consideration. |
|
To consider a report by Councillor Gwyneth Ellis, Lead Member for Finance, Performance and Strategic Assets (copy enclosed) detailing the latest financial position and progress against the agreed budget strategy. Additional documents:
Decision: RESOLVED that Cabinet – (a) note the budgets set for 2022/23 and
progress against the agreed budget strategy, and (b) approve the plans to spend a School
capital grant (£1.799m) to improve ventilation, supporting decarbonisation and
reducing backlog maintenance in schools as detailed in section 6.9 and Appendix
5 of the report. Minutes: Councillor Gwyneth Ellis presented
the report detailing the latest financial position and progress against the
agreed budget strategy. A summary of the Council’s financial
position was provided as follows – ·
the net revenue budget for 2022/23 was £233.693m
(£216.818m in 2021/22) ·
an overspend of £2.661m was forecast for service
and corporate budgets ·
highlighted current risks and assumptions
relating to corporate budgets and individual service areas together with the
impact of coronavirus and inflation ·
detailed service savings and fees and charges
increases (£0.754m); no savings having been requested from Community Support
Services or Schools ·
provided a general update on the Housing Revenue
Account, Treasury Management, Capital Plan and major projects. Cabinet approval had also been
sought for plans to spend a schools’ capital grant to improve ventilation,
support decarbonisation and reduce backlog maintenance. The Head of Finance and Property
highlighted that the increased overspend from the previous month mainly related
to Children’s Services and Adult Social Care which were demand-led services and
difficult to predict. Whilst the overspend
was currently at a level that could be funded with base level reserves, the
overspend was increasing which remained a risk for the Council. Those reoccurring issues would be taken into
account as part of the budget setting process for the next financial year. Reference was also made to other variances
within service budgets and risks to note going forward with regard to a number
of school contracts, including school transport, which had not yet been
finalised and would likely be reported at the next meeting. The pay settlement for both teachers and
non-teachers remained a risk with assumptions based on the current pay offer
which could be afforded in year – any increase would further increase the
current overspend. Finally, reference
was made to the business case before Cabinet for approval in terms of spending
the schools’ capital grant received from the Welsh Government. As Lead Member, Councillor Gill German
elaborated on the proposed spend to improve ventilation in schools and priority
for keeping schools open wherever possible, and addressing the maintenance
backlog in schools and carbon emissions, and added her support to the business
case. In response to a question from
Councillor Barry Mellor, the Head of Finance and Property confirmed that Welsh
Government had developed a funding package which would likely cover the
additional costs to services aiding Ukrainian refugees. RESOLVED that Cabinet – (a) note the budgets set for 2022/23 and
progress against the agreed budget strategy, and (b) approve the plans to spend a School
capital grant (£1.799m) to improve ventilation, supporting decarbonisation and
reducing backlog maintenance in schools as detailed in section 6.9 and Appendix
5 of the report. |
|
CABINET FORWARD WORK PROGRAMME PDF 288 KB To receive the enclosed Cabinet Forward Work Programme and note the contents.
Additional documents: Decision: RESOLVED that Cabinet’s forward work programme be noted. Minutes: The Cabinet forward work programme was
presented for consideration and members noted the following two items had been
added for November – ·
Housing
Local Lettings Policy ·
Replacement
Local Development Plan (LDP) draft revised Delivery Agreement RESOLVED that Cabinet’s
forward work programme be noted. The
meeting concluded at 12.30 pm. |